About this project

Map of Hwy 212 pedestrian bridge work zone
2025 Highway 212 pedestrian bridge in Glencoe

Statewide Pedestrian Bridge Improvement Design-Build Project

  • This project involves modifying and partially reconstructing four pedestrian bridges in MnDOT Districts 1, 8, and Metro.
  • The repairs are intended to increase the lifespan of the bridges.
  • Ramps will be constructed at each end of the new pedestrian bridge to make it accessible to all users.

Traffic impacts

  • The pedestrian bridge spanning Hwy 212 in Glencoe between 6th St. E. and 5th St. E. will be closed during the project.
  • Pedestrians can use Hennepin Ave. N. to cross Hwy 212 during construction.

Project update

March 4, 2025

  • Crews will remove trees within MnDOT right of way and City of Glencoe property in preparation for the project.
  • Tree removal will be completed by March 31.