The project will be constructed in two stages.

Project Elements

  • Pavement reconstruction
  • Sidewalk reconstruction
  • Storm sewer reconstruction
  • Corridor lighting
  • Utility improvements
  • Tree/brush removal

Project Staging

Disclaimer: Staging information and detour routes are subject to change. Estimated durations and detours are as follows. Project staging and detour maps coming soon.

A truck detour will be used for the duration of the project. Truck traffic will detour onto Roseau County roads 4 and 23. Local traffic can use city streets to avoid the road closure.

Stage 1

Hwy 11 will be closed between the east side of 4th St to west side of Hwy 32 intersection (Approximately 5 weeks)

Work to be completed:

  • Install storm sewer on Hwy 11
  • Install storm sewer outlet to South Brantch Two Rivers
  • Reconstruct Hwy 11
  • Sidewalk reconstruction
  • Install bases for corridor lighting

Stage 2

Hwy 11 will be closed between the west side of 7th St to the east side of 4th St (Approximately 7 weeks)

Work to be completed:

  • Install storm sewer on Hwy 11
  • Reconstruct Hwy 11
  • Sidewalk reconstruction
  • Install bases for corridor lighting
Map showing truck detour route
The project will require a truck detour utilizing Roseau County roads 4 and 23.

Stay Informed

Stay informed during the project by attending weekly construction meetings and sign up for email updates on the project website.

Nearby Projects

2025: Hwy 11/313 Warroad
2026: Hwy 11 Roseau to Warroad
2028: Hwy 89 Roseau

Work Zone Safety Tips

  • Obey posted speed limits
  • Drive undistracted
  • Move over-Give workers room to safely complete their work.
  • Know before you go: www.511mn.org
  • Be patient.
  • Do the zipper merge
  • Avoid making unnecessary lane changes
  • Never enter a road blocked with barriers or cones
  • Expect work zones to constantly change